The Sections within the Department of Civil Engineering are organized
through the Operating Units for Track Maintenance (OU-TM), which
cover portions of 20-30km.
TM Section Doboj consists of ten
OU-TMs, the following eight being active:
- OU-TM Modrica
- OU-TM Dragalovci
- OU-TM Doboj I
- OU-TM Doboj II
- OU-TM Kostajnica
- OU-TM Sockovac
- OU-TM Zvornik Novi
- OU-TM Workshop
and 2 currently inactive:
- OU for mechanical track maintenance
Zvornik
- OU ballast pit Doboj
TM Section Banja Luka consists of the following 7 OU-TMs:
- OU-TM Ukrina
- OU-TM Banja Luka
- OU-TM Omarska
- OU-TM Prijedor
- OU-TM Novi Grad
- OU-TM Dobrljin
- OU-TM Workshop
Operating units of the TM Workshop perform the maintenance of
large and small mechanical units, railway facilities along the
tracks and other facilities which the ZRS has at its disposal.
Other OU-TMs maintain tracks with facilities where the railway
transportation is operating.
INFORMATION ON THE LINES IN TERRITORY OF THE REPUBLIC OF SRPSKA
The total of constructed length
of lines in the area of the ZRS is 418,290km of which:
- 393,690km goes to single-track
lines,
- and 24,600km goes to double-track lines
which makes the total of 442,890km
of the open track with the main running lines.
There is total of 338,069km of
electrified lines (25kV, 50Hz) of which:
- 313,469km goes to single-track lines,
- and 24,600 km goes to double-track lines.
The total length of other station
tracks is 162,150. The total length of the tracks (open tracks
with the main running lines and other station tracks) is 578,144km
where the railway transportation is operating.
In the territory of Republic of
Srpska, the Railways of the Republic of Srpska organize the transportation
on the portion (total constructed length of 363,912km) on the
following routes:
- Entity border - Samac –
Doboj – Entity border: 80,972km
· single-track 56,372
· double-track 24,600
- S. Kostajnica – Banja
Luka – Novi Grad: 174,412km
- State border(Croatia) – Dobrljin – Novi Grad: 18,544km
- Novi Grad – Blatna – Entity border: 19,600km
- Entity border – Petrovo Novo – Doboj: 29,194km
- State border(Croatia) – Brcko – Entity border: 7,840km
- Entity border – Caparde – Zvornik Novi – State
border(Serbia) : 21,332km
- Omarska – Tomasica: 10,700km
There is a part of the ZRS lines
where the Serbian Railways are operating:
- portion Jablanica – Strpci and,
- portion Sremska Raca – Bijeljina
in total constructed length of
27,399km.
One portion of the lines is currently
non-exploited in total constructed length of 26,979km:
- portion Brezicani – Ljubija
- Modrica – Gradacac
- Brod – Stata border (Croatia) – Slavonski Brod
- Spreca – Doboj suburb
The lines are mainly od category
D-4 with admissible load of 22,5 tons/axle and 8 tons/meter, gauge:
1435mm.
The lines are constructed with
S-49 rails, mostly with wooden sleepers (partially with concrete
sleepers) , „K“ and „SKL“ track fastening
equipment and with dolomite ballast chips. The tracks on the open
lines are welded and included in the continuous welded rail (CWR).
MECHANICAL UNITS THAT RAILWAYS OF THE REPUBLIC OF SRPSKA DISPOSE
OF
WITHIN THE DEPARTMENT OF CIVIL ENGINEERING